{"refurbishment": {"suggestions": [{"term": "refurbishment", "payload": "", "weight": 404}, {"term": "refurbishment of", "payload": "", "weight": 81}, {"term": "refurbishment projects", "payload": "", "weight": 74}, {"term": "refurbishment project", "payload": "", "weight": 44}, {"term": "refurbishment of the", "payload": "", "weight": 32}, {"term": "refurbishment and", "payload": "", "weight": 28}, {"term": "refurbishment was", "payload": "", "weight": 26}, {"term": "refurbishment scheme", "payload": "", "weight": 20}, {"term": "refurbishment can", "payload": "", "weight": 19}, {"term": "refurbishment can be", "payload": "", "weight": 19}], "numFound": 10}}

Search results for refurbishment

45 items matching your search terms.Sort byrelevance·date (newest first)·alphabetically
  • Capodichino Airport, Italy
    ...  Clan and Quattro LED slash energy consumption by 58 per cent at Capodichino Airport Following a refurbishment project to improve the energy efficiency at Capodichino Airport, Italy, Thorn's Clan and Quattro LED luminaires have reduced the airport's annual light energy consumption by 58 per cent. Highlights of the refurbishment include: A daily energy consumption reduction from 414,854W to 172,260W An annual energy consumption reduction from 151,422kWh to 62,874kWh A reduced number ...
    Located inSolutions / Case Studies / Transportation
  • Darlington, UK
    ...  Darlington Borough Council chose to have a major refurbishment of residential and major roads.    The vast scale of the refurbishment project meant that the replacement had to be split into phases and started with replacing the highest energy using lanterns on major roads in the Darlington area.  After a successful initial phase the project has now spread out into residential areas with the majority of the new lanterns being retrofitted onto the existing street lighting columns but some older ...
    Located inSolutions / Case Studies / Road
  • Heriot-Watt University, Scotland
    ...  universities for business and industry. The project included the refurbishment of the university's 3-4 miles of roads and pathways which were lit with more than 460 SON lamp luminaires. Thorn provided a high quality, reliable product along with a local service with product knowledge and design input. The refurbishment project was based on replacing the old luminaires on a one for one basis. It therefore required a cost effective product that would fit onto a 34mm spigot, weigh no more than 10kg ...
    Located inSolutions / Case Studies / Road
  • Les Andelys, France
    ...  New EP 145 LED transforms light and slashes energy consumption in historic French street EP 145 LED, a traditional 19th Century style street lantern, is now equipped with LEDs to refurbish historic streets and spaces with a durable, energy efficient solution. A recent test refurbishment of a street in Les Andelys, France, involved replacing five 19th Century style ageing mercury MBF 125 lanterns with five EP 145 LED lanterns, with the aim of achieving better light quality along with energy ...
    Located inSolutions / Case Studies / Urban Life
  • Orly Airport, France
    ...  First StyLED luminaires light the way in Orly airport refurbishment Following a successful pre-launch presentation to the top management of Aéroports De Paris, the first of the new StyLED luminaires have been installed at Orly Airport. The French airport is undergoing extensive modernisation work with sustainability and energy saving a top priority. As part of the renovation, the access road to the "Pavillon d'Honneur" was changed from a bilateral installation with 150W HPS lamps every 20m ...
    Located inSolutions / Case Studies / Transportation
  • Kalkari Discovery Centre, Sydney, Australia
    ...  fluorescent tubes with magnetic ballast. The objectives for the refurbishment were therefore to achieve low energy consumption and reduced maintenance as well as a refreshing new look. Offering a flexible solution for the centre's displays, D-CO LED is specifically designed as a halogen replacement offering very easy installation. With efficient LEDs and a long 50,000-hour lifetime, D-CO LED ensures the targeted energy savings and low maintenance solution. For the centre's offices, Polar LED ...
    Located inSolutions / Case Studies / Education
  • Sports lighting - Taking Control
    ...  also heard a talk on 'Sports Lighting in the 21st Century', received updates from the ILP, and had a tour of the stadium before networking and socialising. If you need help with planning your next lighting project - whether it's a refurbishment or new build - simply get in touch. Alternatively, click here to watch our sports stadiums video for inspiration.  Sports lighting - Taking Control Product Manager Iain Wilkie delivers talk at ILP Bristol event ...
    Located inNews
  • Chelsea & Westminster Hospital, UK
    ...  of new build and refurbishment projects. Lighting targeted for significant energy reduction Supported by Ferguson Brown Consultants, Chelsea and Westminster obtained funding to upgrade to LED lighting based on predicted energy and CO2 reductions through the life of each installation. The need to replace existing fixtures point for point with minimal construction work was essential to the project as all areas were live environments so patient care and consideration was paramount. Additionally ...
    Located inSolutions / Case Studies / Health
  • Corigliano Calabro, Italy
    ...  With StyLED now in place, the maintained average luminance had been improved to a fully compliant 37 lux with good uniformity and glare control To meet new roundabout regulations, the lighting at the Frassa crossing roundabout in Corigliano Calabro has been updated and improved with Thorn's StyLED road lantern. This compact roundabout has an outer diameter of 25 meters and a circular central island and is partially passible for heavy goods vehicles. The refurbishment therefore had to take ...
    Located inSolutions / Case Studies / Road
  • Middlesbrough FC, UK
    ...  A variety of our luminaires have been installed at Middlesbrough FC (MFC) to elevate the facility to Premier League standards following the club’s promotion to the English Premier League. In the seven years since the Teesiders dropped out of the top division, the requirements of TV broadcasters have changed dramatically, meaning that Riverside Stadium was in need of significant refurbishment. In keeping with MFC’s principle of supporting local companies and following a visit to our impressive ...
    Located inSolutions / Case Studies / Sports